CCSI

Energen/Alagasco 
 

Building Systems Solutions

 




 CCSI



CCSI Main


Manufacturers


Parts


Presentations


Project Profiles


Quality Statement


Service


Technical Data


Terms/Conditions


Contact CCSI

P.O. Box 43829  
Birmingham, AL 35243  
710 Maple Street  
Birmingham, AL 35210  
205.956.9220, 800.239.9220 205.951.1444 (Fax)  

sales@ccsi-se.com  


Sitemap






Energy Management Important for Energy Provider

 

  Energen - Alagasco Corporate Headquarters

 

(Birmingham, Alabama) Located in the foot-hills of the Appalachian Mountains, Birmingham, Alabama is home to over 240,000 residents with a metropolitan area population of over 1,000,000.  The city hosts a growing population in the healthcare, banking, industrial, service, and engineering businesses.  Birmingham’s skyline is also scattered with hotels, theaters, businesses, high tech hospitals, research and educational institutions.  In addition, a great history gives the city character.

 

Energen’s headquarters is among the leading businesses contributing to the economy of Birmingham. Gas and oil production and exploration are the mainstays of Energen’s business.  In addition to monitoring these assets, the headquarters oversees the productivity of two other divisions: Alabama Gas Company (Alagasco) and Energen Resources.  Alagasco is located within the headquarters and distributes gas to approximately 463,000 homes throughout Alabama.  Energen Resources, on the other hand, controls the reserve locations that dot the western United States.

 

Recognizing the value of energy management, Alagasco works hand-in-hand with Climate Control Systems, Inc (CCSI), a KMC authorized representative, to customize the building controls.  Alagasco’s Assistant Manager of Building Operations, Ragan Taylor, comments on the professional relationship with CCSI, “We have a working contract with CCSI and appreciate the ongoing service that they provide.  They continue to provide us with the high quality of service that we expect.”

 

CCSI helped Alagasco to prove a common misconception about gas absorption chillers.  The controls and equipment contractor helped Alagasco restore their malfunctioning gas absorption chiller to an energy and money savings device.  Gary Frith the Vice President/Principal of CCSI noted that, “Alagasco wanted to disprove that gas absorption chillers were hard to control and maintain, therefore more expensive to operate.”  He continues, “We have integrated the original equipment manufacturer’s controls on these units with the KMC digital building automation system.”

 

To modify the chiller, the company added KMC controls to manage frequency drives that control fan speeds and allow the condenser water temperature to remain in the specified range.  Also included in the modification, KMC products have enabled the chiller to sustain a minimum water flow through the condenser with a bypass valve until the desired water temperature is reached and then it modulates to maintain a set point.

 

The outcome of the project proved to be a success.  “The company”, as Frith stated, “has been able to save $4300 per month based upon being able to utilize the previously unused gas absorption chiller.”  This saving has not come at the cost of discomfort to the employees of the facility.  In fact, due to the change, overall comfort levels have been enhanced dramatically.

 

Alagasco, through the use of KMC products, has monitored the trends of the newly corrected gas absorption chiller.  The trends are viewed through the company’s installation of WinControl® software on the facility’s computers.  In addition to the trends, the digital controls through WinControl also alarm the proper personnel at Alagasco when there is an alert. 

 

Alagasco also had an ongoing problem with its rooftop desiccant units that collect the outside air to distribute throughout the building.  The air passes through a filter, as well as gas water heaters and coils to remove much of the latent cooling load.  The units were not working properly with the controls that were originally installed.  So, with the help of CCSI, the desiccant units were reprogrammed and supplied with KMC controllers and now are working properly. 

 

With the Alagasco facility running smoothly, Ragan Taylor commented, “The biggest benefit of installing KMC controls is the quick response to temperature changes and problems.  Our staff is rapidly informed of such problems; therefore, corrections can be handled in a timely manner.” 







DIGITAL CONTROLS             HVAC EQUIPMENT             IAQ SOLUTIONS

IMG00093.jpg

Copyright© 2009 Climate Control Systems, Inc. All rights reserved. Terms of Use 


Sign In